← The BriefBrief
Event Brief
F-47 program enters engineering and manufacturing phase
Filed: Jul 30, 2026 at 5:07 PM ET
Summary: The Air Force says the F-47 program has begun engineering and manufacturing and is on track for a 2028 first flight.
WHO: Gen. Dale White, director of Critical Major Weapon Systems, U.S. Air Force
WHAT: Announced the F-47 program’s engineering and manufacturing development phase and 2028 first flight timeline
WHEN: Jul 30, 2026 at 4:17 PM ET
WHERE: Dayton, Ohio
WHY: The program entered the engineering and manufacturing phase, with parts maturity, integration, and testing underway
ℹ️ This event is analyzed using pattern arcs, velocity indicators, and source analysis in our MI Console.

Know more. Read less.

The BriefBrief follows the story, so you don't have to read every article. See what happened, how it changed, and where it came from, all in one place.

Same format. Every time.

See how stories unfold →