OREM and UCOR finish a two-year groundwater study to inform design of the EMDF project at Oak Ridge.
WHO:OREM and cleanup contractor UCOR
WHAT:Completed a two-year groundwater elevation data collection campaign to inform design for the Environmental Management Disposal Facility (EMDF) project.
WHEN:Aug 5, 2026 at 10:14 PM ET
WHERE:Oak Ridge, TN
WHY:Routine/scheduled item — no distinct cause reported beyond the event itself.
Reporting from 1 identified publisher for this event.