Overnight lane closures start on SR 2 corridor | The BriefBrief
The BriefBrief
Download on the App Store Get it on Google Play
Event Brief

Overnight lane closures start on SR 2 corridor

Filed: Aug 30, 2026 at 3:00 PM ET
Summary: Caltrans says overnight road work will begin Sunday night, with lane closures and parking restrictions nightly from 7 p.m. to 6 a.m. Sunday through Friday. Santa Monica Boulevard in West Los Angeles and Hollywood, and Glendale Boulevard in Echo Park, will see staged lane reductions for curb, gutter and sidewalk construction.
WHO: Caltrans
WHAT: Overnight road work with lane closures and parking restrictions on SR 2 corridor segments.
WHEN: Aug 30, 2026 at 7:26 AM ET
WHERE: Los Angeles, CA
WHY: The work is for curb, gutter and sidewalk construction.
ℹ️ This event is analyzed using pattern arcs, velocity indicators, and source analysis in our MI Console.

Know more. Read less.

The BriefBrief — updated continuously, every category, every day.
PIA PK-784 returns to Toronto after cargo fire alarm
Pia Aug 30, 2026 at 3:06 PM ET 🔒
Trump threatens to report Kristen Welker to FCC
Donald Trump Aug 30, 2026 at 3:06 PM ET 🔒
Milo Yiannopoulos deported from US to UK
Milo Yiannopoulos Aug 30, 2026 at 3:06 PM ET 🔒
Mother bear, 3 cubs freed from La Verne tank
Bear Rescue Aug 30, 2026 at 3:00 PM ET 🔒

Page 6 of 35916

Same format. Every time.

Continue reading — sign in or create a free account with