TDOT: SR 111 J-Turn safety project on schedule | The BriefBrief
The BriefBrief · Intelligence, not news.
Download on the App Store Get it on Google Play
Event Brief

TDOT: SR 111 J-Turn safety project on schedule

Filed: Sep 09, 2026 at 4:00 PM ET
Summary: TDOT says the SR 111 J-Turn safety improvements project in Putnam County remains on schedule, with crews continuing foundational work and roadway widening. Over the past two weeks, workers focused on subgrade preparation and base stone installation, including progress on the southeast side.
WHO: Tennessee Department of Transportation (TDOT)
WHAT: SR 111 J-Turn safety improvements project construction is progressing as scheduled, including subgrade preparation and base stone installation for roadway widening.
WHEN: Sep 09, 2026 at 2:45 PM ET
WHERE: Putnam County, Tennessee
WHY: Routine/scheduled item — no distinct cause reported beyond the event itself.
ℹ️ This event is analyzed using pattern arcs, velocity indicators, and source analysis in our MI Console.

Know more. Read less.

The BriefBrief — updated continuously, every category, every day.
GOP seeks to put Trump on ballot at midterm convention
Donald Trump Sep 09, 2026 at 4:03 PM ET 🔒
Apple Watch adds Audio Intelligence and Live Rewind
Apple Sep 09, 2026 at 4:03 PM ET 🔒
BOE Attorney Cantrell Responds to Gaylor Comments
Campbell County Sep 09, 2026 at 4:00 PM ET 🔒
Rockwood Electric schedules outage for Kingston
Power Outage Sep 09, 2026 at 4:00 PM ET 🔒

Page 18 of 28201

Same format. Every time.

Continue reading — sign in or create a free account with